Document control.

The right version, to the right people, at the right time.

Creo Solutions runs document control for construction and infrastructure projects. We set up the system, keep the register, issue every transmittal and hand the owner a complete, verified record.

  • Coded

    One naming convention across every discipline

  • Tracked

    Every revision, transmittal and response logged

  • Archived

    A handover the owner can actually use

Document register · Illustrative projectIllustrative
CodeTitleRev.Status
ARC-DWG-A-201Level 2 plan · Block ACIssued for construction
MEC-SHD-M-044Shop drawing · AHU-31For comment
GEN-RFI-0187RFI · L3 slab penetrationn/aAwaiting response
ELE-SPC-260500Specs · Electrical, common reqs.BApproved
CIV-DWG-C-110Site grading and drainage2Approved
STR-DWG-S-110Foundations · Grid 4ASuperseded
Transmittal TR-0412 · 6 recipientsAcknowledged 4 / 6

Document control

  • Registers
  • Transmittals
  • Revisions
  • RFIs
  • Handover

01 · The document lifecycle

One document, controlled from first issue to archive.

This is the job. At every stage we know which revision is current, who received it, who still owes a response, and we can prove it.

  1. 01 · P1

    Created and coded

    Numbered to the convention, logged in the register.

  2. 02 · A

    Issued for review

    Sent by transmittal to the distribution matrix.

  3. 03 · A

    Commented

    Reviews consolidated, response clock tracked.

  4. 04 · B

    Approved

    Status and approver recorded against the revision.

  5. 05 · C

    Issued for construction

    The only version on site. Receipt acknowledged.

  6. 06 · A, B

    Superseded

    Older revisions withdrawn from use, kept on record.

  7. 07 · AB

    Archived at handover

    As-built, indexed to the owner's requirements.

02 · Services

What we take off your team's plate.

Full service or à la carte, depending on your project's phase and size. Each service ends in a deliverable you keep. Your project managers stay on the project, and your contractual obligations stay covered.

  • DC-01

    System setup

    Document management plan, naming and numbering conventions, folder structure, distribution matrices and approval workflows tailored to your contract.

    DeliverableDocument management plan

  • DC-02

    Dedicated document controller

    A dedicated resource embedded in your project team, on site or remote, for the full duration of the mandate.

    DeliverableRegister kept current daily

  • DC-03

    Transmittals and correspondence

    Issuing, receiving and tracking transmittals, acknowledgements and follow-ups, and keeping the project's official correspondence log.

    DeliverableTransmittal and correspondence log

  • DC-04

    Revisions and approvals

    Review cycles for drawings, specifications, shop drawings and submittals; version control and withdrawal of superseded documents.

    DeliverableSubmittal and approval tracker

  • DC-05

    RFIs, notices and directives

    Logs for requests for information, change notices and site directives, with tracking of contractual response times.

    DeliverableRFI log with response clock

  • DC-06

    Handover and archiving

    Closeout packages: as-built drawings, operation and maintenance manuals, warranties, and archiving to the owner's requirements.

    DeliverableVerified closeout package

03 · Numbering and traceability

A number that tells you what it is.
A history that tells you what happened.

Our naming convention makes any document findable by anyone on the team. Every revision keeps its trail: when it was issued, by which transmittal, to whom, and why it was replaced.

Anatomy of a document number
ARCDisciplineArchitecture
DWGTypeDrawing
AZoneBlock A
201SequenceLevel 2, sheet 1
CRevisionCurrent IFC

The convention is written into the document management plan at setup, aligned with the owner's standard where one exists, and enforced on every document that enters the register.

Revision history · ARC-DWG-A-201Illustrative
Rev.Purpose of issueTransmittalReceived
P1Preliminary · coordinationTR-01185 / 5
AIssued for reviewTR-02036 / 6
BIssued for tender · addendum 2TR-02978 / 8
CIssued for construction · currentTR-04124 / 6

Follow-up2 recipients have not acknowledged TR-0412. Follow-up sent automatically after the contractual delay.

04 · Method

A four-step method.

  1. Assessment

    Review of contractual requirements, stakeholders and the tools already in place.

    OutputDocument control audit

  2. Configuration

    Naming conventions, templates, workflows and access rights set up in the chosen platform.

    OutputConventions and workflow matrix

  3. Operation

    Daily control, up-to-date registers and periodic status reports to project management.

    OutputRegisters and status reports

  4. Handover

    Completeness check, final package to the owner and archiving.

    OutputCloseout package and archive index

05 · Platforms

Tool-agnostic. Document control experts.

We work in whatever document environment your contract or project owner requires. No migration imposed. The discipline stays the same; only the software changes.

  • Oracle Aconex
  • Oracle Unifier
  • SharePoint / Microsoft 365
  • Autodesk Construction Cloud
  • Bentley ProjectWise

07 · Engagement models

An engagement for every phase.

From one-off support to a dedicated resource, the engagement scales with document volume and project stage.

Engagement A

Resident

A full-time document controller based in the site office, for high-volume projects.

Best forConstruction phase, high-volume projects

Talk to us about terms
Engagement BMost requested

Hybrid / remote

A shared resource working in your platform, on site at key milestones.

Best forDesign to construction, mid-size projects

Talk to us about terms
Engagement C

One-off

System setup, audit or recovery of an existing record, or final handover preparation.

Best forProject start, a record in trouble, closeout

Talk to us about terms

08 · Contact

Is your document record under control?

Tell us the phase, platform and document volume, and we'll come back with an engagement proposal. Starting mid-project or recovering a messy record is fine.

Start a project
Office
4388 Rue Saint-Denis, Suite 200
Montréal, Québec
Document control · CREO Solutions